[ Interactive Demo ]

Pareto Front Explorer

Synthetic data center — 48 racks, 8 CRACs, 2MW IT load. Every point is a Pareto-optimal configuration. Select one to explore the trade-offs.

Demo DC-01
ASHRAE Class A1 · 27°C limit
● Synthetic data

Using a simplified thermal model. In production: surrogate trained on your BMS/DCIM telemetry, validated against CFD.

Pareto Front — 4 Objectives

— solutions
Pareto optimal Current operation● Drag to rotate · Scroll to zoom · Click to select
PUE
Max Inlet
—°C
Thermal Margin
Max IT Load
—MW

EU A-G Rating

Select a configuration

Operational Setpoints

Supply Temp
CRAC Flow
Chiller VFD
IT Load

Rack Thermal Map

8 rows × 6 cols · 48 racks
Current
Selected
18°C
32°C

Trade-off Analysis

Select a point on the Pareto front to see the trade-off analysis vs. current operation.

Pareto front computed offline — no live optimization is running.

Want this with your real data?

We train a surrogate model on your BMS/DCIM telemetry and compute your operational Pareto front. See your current A-G rating and the path to improve it.

REQUEST ASSESSMENT →